Renovation Chalet 800 23 September, 202018 February, 2021in Chalet by Pim and Jorinde RENOVATION Start 20 march 2020 20th of March 2020This is the mountain house before the renovation 30th of March 2020All the walls we don't need are demolished. 17th of April 2020It is time to demolish the roof after demolishing a lot of walls 29th of April 2020The outside wall of stones had to be rebuild with the old stones we had left from demolishing the inside walls 18th of May 2020All the inside floors of concrete are finished, preparing for the wooden construction on top 27th of May 2020The second floor of the wooden floors is under cunstruction. The openings for the doors and windows are ready 9th of June 2020The roof is done and outside walls in stone are finished 30th of June 2020We have almost reached the highest point of the outside walls in wood 30th of July 2020All the windows and doors are installed 17th of October 2020The balcony and terrace are finished FOLLOW US Facebook Strava Instagram Google